Cal-Mac Ferry Terminal, Tobermorey - Liquid Applied Waterproofing

Background

 

The Caledonian MacBrayne ferry terminal, in the port of Tobermory on the Isle of Mull, was in need of refurbishing. The external café terrace area, popular with passengers passing through the terminal, had become dilapidated, and the area needed rejuvenating. IMA contractor George Brolly & Co and BMI UK & Ireland was asked to propose a new waterproofing solution for the lower level terraces.

Challenge

Existing terrace areas were constructed on solid concrete, asphalt and paving slabs and were beginning to show signs of deterioration, and the development of potential hazards for customers. Aside from its primary purpose as a waterproof layer, the proposed solution also had to be suitably robust, delivering an anti-skid surface whilst also creating an aesthetically pleasing environment for passengers. Timing was also critical, as the works were scheduled for the busy summer months, and so interruption to business was to be kept to a minimum.

Overview

Project: CalMac Ferry Terminal
Area: 200 m
2
Completion Date: June 2009 
IMA Contractor: George Brolly & Co (Roofing) Ltd
Client: Caledonian MacBrayne
Specifier: Graham & Sibbald, Glasgow
System: Elastoflex Liquid Waterproofing System

Download this case study

     

Solution

The George Brolly team first removed the paving slabs and then inspected the asphalt below, concluding that it was able to receive an overlay system. BMI UK & Ireland’s Elastoflex liquid-applied waterproofing membrane was then applied, together with a very robust, anti-skid surface finish.

Before application, the asphalt surface was thoroughly prepared and primed, with treatments including a fungicidal wash, used to eliminate any future weed or moss growth.

The Elastoflex system is applied wet-on-wet, which allows fast installation of the primary waterproofing layers. This subsequently allowed for the quick application of the anti-skid surface.

The end result was such a success that George Brolly received the NFRC Scottish Flat Roofing Award for 2009.

 

CalMac-Ferry-Terminal-02
CalMac-Ferry-Terminal-04

 









































 

























    Contact Us

    +44 843 224 7400

     

    email: ima@bmigroup.com

    Join the IMA

    If your business can demonstrate a track record in roof waterproofing excellence across a range of projects we'd like to hear from you.

    Join the IMA

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser

    grey-1900x1200